Press Release – December 2009

Common bricks from the Czech Republic

Heluz – Europe’s most modern common brick factory in Hevlin

[December 2009] At the beginning of March the Heluz brick factory in the Czech town of Hevlin on the Austrian border was officially commissioned. The foundation stone for the new brick factory was laid in October 2007. The planning and implementation of this new highly-modern common brick plant lay with KELLER HCW; the preparation equipment was supplied by Rieter-Werke in Constance. The new production facility increased the total production of the company by 40%.

The project

A complete new production plant for the manufacture of highly porous common bricks with an output of 800 t/d of fired goods was built on the existing factory site. Different sizes with a bulk density of up to 0.6 kg/dm³ can be manufactured in the factory. Grinding of the complete product range is possible.

The basic raw materials for the manufacture of common bricks are clay from the existing pit, which is mixed with saw dust and papermaking sludge as aeration agents. The use of Styrofoam as an additive is also possible. The necessary raw material testing was carried out in KELLER HCW’s in-house ceramic laboratory in Ibbenbüren-Laggenbeck.

For the design of the factory by KELLER HCW GmbH, important criteria adapted for local conditions were determined jointly with the owner:

Optimum utilization of the production hall
Gentle handling of the products
Assurance of quality and quantity
High availability of the plant
Reduced spare parts requirements
Efficient use of energy for the operation of machinery, dryer and kiln

Project data

The output of the new common brick factory is up to 800 tonnes of fired goods per day with a bulk density of 0.8 kg/dm³. Products with a bulk density of up to 0.6 kg/dm³ can be manufactured in the new plant by the increased use of aeration agents.

Working times – Preparation plant
50 weeks/year
7 days/week
2 shifts/day
7 hours/shift (effective)

Working times – Shaping plant and machinery
50 weeks/year
7 days/week
3 shifts/day
7 hours/shift (effective)

Output for the reference size
16,089,150 common bricks/year
321,783 common bricks/week
45,969 common bricks/day
2,189 common bricks/hour

Reference size
For the plant start up the reference size 380 mm × 247 mm × 238 mm with a perforation of 59% and the two bulk densities 0.6 kg/dm³ und 0.8 kg/dm³ was agreed.
Common bricks, partition wall bricks and acoustic bricks can be manufactured as additional products.

Production

Material preparation
The raw clay material is fed into 2 box feeders by front-end loaders, then removed by steel slat conveyors and fed to the preparation plant via a belt system. Papermaking sludge from a third box feeder as well as pre-prepared saw dust from a silo are added to the clay material as aeration agents. Metal parts contained in the raw material are removed before entering the grinding pan by means of a metal detector with a reversible conveyor.

In the grinding pan, which has central material feed and closed plates on the inside runners, the material is pre-crushed, moved to the outside grinding tracks with perforated plates by means of scrapers where it is crushed again and finally pressed through the perforations onto the collector plates. These are running in the opposite direction under the grinding pan and they feed then on to the next grinding level via a belt. The water addition at the grinding pan is controlled via a moisture control and measuring system so that continuous material humidity is achieved. In the following roller mill, which has a grinding gap of 2 mm, the crushing of the material is continued. A material distributor directly before the roller mill arranges for an even material distribution over the mills to avoid uneven wear. Automatic lathes are used for the turning of the roller shells. The final grinding size of 0.8 mm is achieved by the following high-capacity fine roller mill with mono-cradle.

The preparation machinery is connected to a de-dusting plant. The collected dust is added back into the mix from the dust filter to the material flow on the belt.
The ready prepared material is fed to the aging plant or alternatively directly to the shaping plant via a belt system.

In the aging plant the material is intermediately stored in six storage bins to mature so that a continuous plasticity of the material can be reached during the shaping process. The material is fed by a computer controlled belt system to achieve a homogenous mixing of the material in the bin. The working material is removed from the aging plant and fed to the shaping plant by a computer controlled automatic longitudinal excavator.

The shaping plant starts with the box feeder which serves as a material buffer between the preparation and shaping plant. Via a belt system, which allows for the discharge of the material into a prepared container, the material is fed to a third roller mill where any dried out material is crushed. A further metal detector is installed in front of the shaping machinery to eliminate metal parts, thereby avoiding unnecessary wear of the machinery.

In the circular screen feeder the material is again mixed thoroughly, the final humidity is achieved and the material is pressed through screen sheets and fed to the extruder group. Humidity is controlled by an automatic humidity measuring and control system by measuring the pressure head pressure and the power supply at the extruder worm.

In the vacuum double shaft mixer the material is mixed again, de-aerated in the vacuum chamber and fed to the worm extruder. At the outlet of the mixing chamber the mass of the mixer is shredded into small pieces by rotating knives and a tooth comb to ensure a fast and thorough aeration. In the circular screen feeder and the double shaft mixer, steam, generated by a separate steam generator, is added to the material.

In the worm extruder the compacted material is fed via the pressing cylinder and pressure head to the die where the first shaping step (length and width of the brick) is achieved. The brick height is defined in the following cutter system.

Machinery – Wet side
The extruded clay column is fed to the cutting device via a transfer plate. A measuring belt determines the exact clay column speed for the precise control of the cutting device. Because of the high preparation water content and the very fine perforation there is the risk of product deformation caused by the transport of the cut product. To overcome this problem a punching device is installed in front of the cutting device. In the cutter one brick per working cycle is cut from the clay column and then transferred to a frequency-controlled belt creating a defined distance between the cut products. Cutting of the products is effected with waste which is re-fed to the shaping plant via a waste transport system.

Three 4-axis industrial robots gently grip 4 products each on the cut face and load one prepared pallet each. A transport carriage transports the loaded pallets into the area of the dryer car loading while a belt conveyor simultaneously transports three empty pallets into the area of the pallet loading. The loading of the prepared dryer car with loaded pallets, as well as the preparation of empty pallets on the belt conveyor, is achieved by a driving gear mounted on a craneway. In case of size changes a further driving gear stores the required pallets in a pallet storage, depositing or alternatively retrieving them.

Tunnel dryer plant
The dryer plant is designed as a tunnel dryer with two separately controlled tunnels and wet storages installed in front of them. Each tunnel is equipped with an exit sluice to maintain the drying climate.
The circulation required for drying is effected for each tunnel and each circulation circuit via three axial fans installed in an intermediate ceiling. The drying air is blown between the products and then circulated by means of slot nozzles installed in the intermediate ceiling. The required heat energy comes primarily from the kiln. Additionally required energy is generated via an auxiliary burner and fed to the dryer via radial fans.
Corresponding to the drying characteristics, the tunnel dryer is separated into 10 climate zones. The saturated wet air is discharged out of the dryer via axial fans installed in wet air stacks. The control of the supply air and waste air flows is effected via electrically driven control valves installed in the ducts or air channels, or via the rotary speed of the wet air fans respectively. Measuring devices for pressure, moisture and temperature arrange for an air and temperature control in the tunnel dryer exactly adapted to the respective situation (e. g. with size changes).
The automatic control of the dryer is effected by a freely programmable process computer. Consumption and status data can be called up at any time.
Format dependant drying curves are retraced fully-automatically, synchronized with the actual value and adjusted if required.

Dry side and setting machine
Unloading of the pallets loaded with the dried products is effected sequentially to the wet side via a driving gear with gripper. A carriage transports the loaded pallets into the unloading position; the transport of the empty pallets into the take-off position is effected simultaneously by means of a liftable and lowerable conveyor. In the take-off position the empty pallets are taken-up by the driving gear and deposited on the stillage of an empty dryer car. The return transport of the empty and stacked pallets to the wet side is effected by the dryer cars.

A driving gear with a corresponding gripper unloads the pallet and deposits the dried products on belt conveyors. A fixed storage table is installed for the format dependant intermediate storage of products.
The products are grouped and fed to the setting robots via a two-row belt conveying system and a stop. The combination of turning device and turnover star allows the bricks to be turned onto the cut face. Two industrial robots grip the products which are taken off the conveyor by lifting plates and they are arranged on the tunnel kiln car in a blade setting pattern. For an easier gas release of the bricks during the firing process, the individual layers are set with the teeth on top of each other whereas for the setting of intermediate wall bricks separate fully-automatic exchangeable robot gripping tools are used.

Tunnel kiln plant
The kiln plant, fired with natural gas, consists of a heating-up zone, firing zone and cooling zone and is designed as a tunnel kiln. In the preheater the residual moisture is driven from the dried products and they are prepared for the heating-up and firing process. Furthermore, the preheater serves as an inlet sluice to maintain a continuous pressure profile in the kiln.

In the heating-up zone high-velocity burners with ignition and flame control are installed in the tunnel kiln walls or in the kiln ceiling. These burners are equipped with a central combustion air supply and in combination with the flue gases they heat-up the kiln car load. Furthermore, in the heating-up zone the tunnel kiln is equipped with a laterally installed flue gas circulation system. This serves for the better burnout of the aeration agents and the temperature distribution. The heating of the tunnel kiln is mainly effected via the kiln ceiling by feeding natural gas as fuel to the tunnel kiln via a top burner plant consisting of a certain number of injector burners. In the firing zone burners are combined in groups over two firing lanes.
The top burner plant is designed with a common air and gas supply system.
All burner groups are equipped with a valve train at their inlet allowing the burner groups to be switched-off off during the pushing process or in case of faults.
For cooling purposes fresh air is forced into the tunnel kiln by pressurised air fans and fed to the hot bricks. Part of the hot air is drawn off and fed to the dryer. The residual air flows through the firing and heating-up zones.
The hot flue gases flow from the firing zone through the kiln load towards the kiln inlet, heating up the products on the kiln car. The cooled flue gases and the low temperature carbonization gases are taken off at the kiln inlet side and are fed to a regenerative thermal post-combustion system. The gases, contaminated with harmful substances, flow into the heat exchanger chambers which are filled with a ceramic material and thereby heated up. This causes the ignition of the volatile organic matters. In the firing chamber the mixture ignites and is discharged via the next heat exchanger. This causes the flue gases to cool down and releases the heat back into the ceramic heat exchanger. The cooled and cleaned air is fed via a stack to atmosphere.

The entire kiln plant is equipped with automatic measuring, control and regulating systems and a process computer used for process control. Corresponding switching devices are installed for the control of security-related functions. Faults are reported acoustically and can be listed and logged via the computer. The current fault message is displayed at the switch cabinet.

Unloading – packaging
The fired bricks are removed from the tunnel kiln cars by 2 industrial robots and set onto two belt conveyors. A two-row belt conveyor system transports the fired bricks to the grinding station. Bricks, which are positioned on the cut face, are suitably arranged for the grinding machines by a combination of a turning device and a turnover star. The separation of the two incoming brick rows is effected by a transfer device followed by a belt conveyor. The two brick rows are fed into a single two-step grinding machine, each via an angular transfer device and chain conveyor system, where they are ground to size plane-parallel. A feeding system arranges for the automatic centring of the bricks and transfer to the transport system of the grinding machine. The low-wear transport system guarantees the precise guiding of the bricks passing through and compensates for any uneven thickness of the bricks. The adjustment of the individual grinding heads via servo-drives guarantees an exact holding point and an exact readjustment. This is further improved by using a specially developed measuring system. After the grinding process, the accrued brick dust is taken off and fed to two independent de-dusting plants. The surrounding area is protected from noise and dust emission by two separate acoustic hoods; the access to the grinding machine for service operation is fully maintained.

After the grinding process the bricks, free from brick dust, are put onto the cut face and grouped to dispatch pack layers. An industrial robot stacks the brick layers onto pallets. The stacks of empty dispatch pallets are loaded onto a magazine conveyor, separated by a transfer device, fed to the loading position via a chain conveyor system and then adjusted. The packed dispatch pallets are transported through the packaging plant via chain conveyors. A film hood is put over the dispatch packs by means of an automatic film hood machine, shrunk and then transferred to the magazine chain conveyor. There they are removed by a forklift and transported into storage.

Control system
The control of all machine and plant components as well as the preparation and shaping plant is effected by a switch and control centre with PLC SIMATIC S7, designed and produced by KELLER HCW.

Coordinated components and standard interfaces give a smooth operation.

The use of visualization systems increases the operation reliability. At the same time these systems minimize downtime in case of faults.

Another advantage regarding reliability is the worldwide teleservice of the KELLER HCW plants. In case of faults, diagnosis of the reasons behind machine or operating faults can be done quickly. The availability of automation and process guidance systems are essentially improved. If necessary, the service specialist can directly influence the control of the plant.

Teleservice permits the remote visualization and control of the plant, programming of the process control computer and the programmable logic control (PLC), specific analysis of operating and fault messages as well as file transfer, software updates and documentation.


Further information can be found under the following links:

Press Release 05/2009 »

Press Release 03/2009 »

Press Release 11/2008 »

Press Release 03/2008 »

Brochure 09/2009 »

Project data of the plant »

...................................................................................

top »

Picture 1:
Box feeder in the area of raw material feeding

...................................................................................

Download pdf-file [1,2 MB] »

top »

Picture 2:
Grinding pan in the area of material preparation

...................................................................................

Download pdf-file [1,3 MB] »

top »

Picture 3:
Fine roller mills in the area of material preparation

...................................................................................

Download pdf-file [1,3 MB] »

top »

Picture 4:
Aging plant with fully automatically longitudinal excavator

...................................................................................

Download pdf-file [1,2 MB] »

top »

Picture 5:
Shaping plant consisting of: box feeder, roller mill, circular screen feeder and worm extruder

...................................................................................

Download pdf-file [1,3 MB] »

top »

Picture 6:
Cutting device

...................................................................................

Download pdf-file [1,4 MB] »

top »

Picture 7:
Dry pallet loading by means of 4-axial industrial robot

...................................................................................

Download pdf-file [1,6 MB] »

top »

Picture 8:
Wet side consisting of: cutting device, dry pallet loading, dryer car loading and pallet storage

...................................................................................

Download pdf-file [1,5 MB] »

top »

Picture 9:
Dryer cars loaded with wet products in front of the wet storage

...................................................................................

Download pdf-file [1,4 MB] »

top »

Picture 10:
Hot air duct with distribution lines to the axial fans

...................................................................................

Download pdf-file [1,4 MB] »

top »

Picture 11:
Dryer exit sluice

...................................................................................

Download pdf-file [1,3 MB] »

top »

Picture 12:
Dryer car and pallet unloading

...................................................................................

Download pdf-file [1,6 MB] »

top »

Picture 13:
4-axial industrial robot for setting the kiln car load

...................................................................................

Download pdf-file [884 KB] »

top »

Picture 14:
Top fired tunnel kiln

...................................................................................

Download pdf-file [1,3 MB] »

top »

Picture 15:
Tunnel kiln exit sluice

...................................................................................

Download pdf-file [1,3 MB] »

top »

Picture 16:
Kiln car with fired products

...................................................................................

Download pdf-file [1,6 MB] »

top »

Picture 17:
Transfer device to separate the incoming brick rows

...................................................................................

Download pdf-file [1,4 MB] »

top »

Picture 18:
Grinding machine

...................................................................................

Download pdf-file [1,3 MB] »

top »

Picture 19:
Packaging plant with transfer device

...................................................................................

Download pdf-file [1,3 MB] »

top »

Picture 20:
Removal of the dispatch packs

...................................................................................

Download pdf-file [1,2 MB] »

top »

Picture 21:
(from right) Owner Graduate Engineer Vladimir Heluz, Managing Director from KELLER HCW Laurenz Averbeck

...................................................................................

Download pdf-file [1,2 MB] »

top »

Picture 22:
3D view of the plant

...................................................................................

Download pdf-file [1,1 MB] »

top »

Picture 23:

Legend:

Preparation plant
1. Automatic box feeders for clay and papermaking sludge feeding
2. Silo for saw dust addition
3. Wet mixing and grinding pan
4. Fine roller mill type "Titan"
5. De-dusting plant
6. Fine roller mill type "Gigant"

Aging plant
7. Storage bin
8. Fully automatically longitudinal excavator

Shaping plant
9. Storage box feeder
10. Roller mill type "Koloss"
11. Circular screen feeder
12. Vacuum unit type "Variat"

Wet side
13. Big pallet loading – Loading robot
14. Dryer car loading
15. Big pallet storage

Dryer plant
16. Wet storage
17. Tunnel dryer with several climate zones
18. Exit sluices

Setting machine
19. Dryer car unloading
20. Big pallet unloading
21. Setting robot

Kiln plant
22. Preheater
23. Top fired tunnel kiln
24. Exit sluice

Unloading – packing
25. Repair pit
26. Kiln car cleaning device
27. Tunnel kiln car – unloading robot
28. Grinding station
29. Packing robot
30. Automatic film hood machine
31. Empty pallet feeding

...................................................................................

Download pdf-file [1,1 MB] »

top »

  Your Contact Persons:

Yvonne Lammers
Marketing & PR Assistant

Telephone: +49 (0) 5451 85-229


Wolfgang Brunk
Head of the Department Marketing & PR

Telephone: + 49 (0) 5451 85-278
 
Press Releases »

Brochures »

Videos »

Fairs »

Internet Ranking »
Years of publication:

2010 »

2009 »

2008 »

2007 »

2006 »

2005 »

2004 »

2003 »

2002 »

2001 »

1999 »

  Download pdf

The download pdf-files have a resolution of 300 dpi cmyk.